Previous
Back to index page
Next
Start slideshowStop slideshow
23 / 33:

DSC01120.JPG

DSC01120.JPG

The frame and floor was covered with new vynil, then slide under the RV, and raised slowly into position and screwed into place. We then lowered the entire rv onto it's axles, and then leveled the frame before assembly. Here is the kitchen going back together. You can see the new covered floor. It's covered under the walls and cabinets like the factory did it.

Generated by iWebAlbum